Quantities off the IFC drawings

IFC rev 2, issued 22 Dec 2025. As received, with nothing added and nothing corrected.

4 rows are incomplete. A missing quantity, unit or drawing. The Bee leaves each blank rather than guessing a measurement, and says below how each was settled. Show them
CodeDescriptionKindUnitQuantityDrawing
DRW-031Fixing of main and internal door frames with groutingLabournos1,176A-610
DRW-032Hanging of door shutters and fixing of hardwareLabournos1,422A-610
DRW-033Fire door installation with intumescent sealingLabournos78A-610
DRW-034Surface preparation of doors for polish and paintLabournos1,422A-310
DRW-035Fixing of uPVC windows, ventilators and fixed glazingLabourm212,440A-610
DRW-036Glazing, beading and silicone sealingLabourm215,560A-610
DRW-037Balcony sliding door fixing and track alignmentLabourm23,120A-610
DRW-038Fixing of safety grills and mosquito meshLabourm26,920A-620
ELE-049Concealed conduit laying in slabs, beams and wallsLabourm1,09,200E-250
ELE-050Riser conduit, cable tray and bus duct support erectionLabourm16,180E-250
ELE-051Wiring, looping and termination in conduitLabourm2,74,600E-250
ELE-052Low voltage wiring, data, telephone and televisionLabourm69,600E-250
ELE-053Fixing of switches, sockets, plates and fan pointsLabourm19,580E-250
ELE-054Earthing pit excavation, strip laying and continuity testingLabourm2,200E-250
ELE-056Testing, load trial and MSEDCL liaisonLabournos1E-250
ELV-003Lift installation, testing and commissioningLabournos5E-601
ELV-004Lift pit waterproofing and machine room civil worksLabourlot1A-501
EXT-020Earthwork, grading and compaction, external areasLabourm29,800C-301
EXT-021Sub base laying, kerb fixing and paver layingLabourm29,240C-301
EXT-022Bituminous road laying and rollingLabourm23,200C-301
EXT-023Compound wall erection and gate installationLabourm21,240C-310
EXT-024Storm water drain, manhole and external sewer layingLabourm23,324C-330
EXT-025Street lighting erection, cabling and testingLabourm21,848C-320
EXT-026Lawn preparation, turfing and tree plantingLabourm25,200C-340
EXT-027Irrigation system laying, testing and commissioningLabourm23,400C-340
EXT-028Play area surfacing and equipment installationLabourm2480C-320
FAC-025Survey, setting out and bracket fixing on slab edgesLabourm29,800A-401
FAC-026Installation of mullions and transomsLabourm29,800A-401
FAC-027Glass installation, structural glazing and DGULabourm211,400A-401
FAC-028Structural and weather sealant applicationLabourm211,400A-401
FAC-029Water leakage testing, cleaning and handoverLabourm211,400A-401
FAC-030ACP panel fabrication and installationLabourm22,400A-401
FAC-031Dry stone cladding fixing, podiumLabourm21,240A-406
FAC-032Glass railing and handrail installationLabourm22,180A-406
FIR-027Hydrant and sprinkler installation, hydro testing and fire NOC supportLabourlot1F-130
FLR-031Laying of vitrified and ceramic floor tiles with adhesiveLabourm21,35,400A-330
FLR-032Laying of wall tiles and dado with adhesiveLabourm245,800A-320
FLR-033Skirting, grouting, cleaning and protectionLabourm24,800A-330
FLR-034Screed laying and floor levellingLabourm29,400A-330
FLR-035Laying of granite and marble in floors and claddingLabourm212,480A-331
FLR-036Laying of Kota stone in service areas and basementsLabourm211,040A-330
FLR-037Edge polishing, nosing and mirror polishingLabourm24,580A-330
FLR-038Kitchen platform fabrication, cut outs and fixingLabourm23,400A-330
MAS-002Internal plaster, 12 mmLabourm2missingmissing
MAS-009Block work in superstructure, 200 mmLabourm254,200A-301
MAS-010Block work in superstructure, 150 and 100 mmLabourm219,400A-301
MAS-011External plaster, 20 mm, two coatsLabourm262,800A-311
MAS-012Ceiling plaster, 6 mmLabourm242,600A-310
MAS-013Chicken mesh at RCC junctions and groove cutting at service chasesLabourm218,600A-310
PLB-043Laying of CPVC and uPVC pipes with sleeves and clampsLabourm64,900P-101
PLB-044Riser and shaft piping erection with supportsLabourm11,740P-101
PLB-045Fixing of sanitaryware, CP fittings and accessoriesLabourm6,132P-120
PLB-046Pump room erection, header fabrication and alignmentLabourm2,460P-130
PLB-047Pressure testing, flushing and chlorinationLabourm24,700P-130
PLB-048STP and rainwater harvesting erection and trial runLabourm6P-150
PNT-011Putty application and sanding, internal wallsLabourm21,98,400A-310
PNT-012Primer coat, internal wallsLabourm21,98,400A-310
PNT-013Two coats acrylic emulsion, internal wallsLabourm21,98,400A-310
PNT-014Putty, primer and emulsion, internal ceilingsLabourm242,600A-310
PNT-015Surface preparation and crack filling, externalLabourm262,800A-311
PNT-016Alkali resistant primer, external wallsLabourm262,800A-311
PNT-017Two coats textured exterior emulsionLabourm262,800A-311
PNT-018Anti-carbonation coating on exposed RCCLabourm27,400A-311
PNT-019Enamel painting of MS grills and railingsLabourm26,240A-311
PNT-020Melamine polishing of doors and framesLabourm23,180A-310
PNT-021Epoxy coating, basement floors and plant roomsLabourm211,400A-330
PNT-022Line marking and signage painting, basementsLabourm28,600A-330
PNT-023Scaffolding, staging and protection for paintingLabourm262,800A-311
STR-004RCC work including shuttering and deshutteringLaboursq ft2,64,000S-001
STR-005Excavation and shoring, 2 basementsLabourm318,400C-010
WPF-001Basement raft and retaining wall membrane, APP modifiedLabourm221,400C-020
WPF-002Podium deck membrane with protection screedLabourm28,600A-120
WPF-003Lift pit and sump waterproofing, crystallineLabourm21,240A-501
WPF-004Toilets, balconies and utility areas, polyurethane coatingLabourm224,800A-320
WPF-005Terrace and overhead tank waterproofingLabourm26,400A-130
Showing 75 of 318 rows.
What happens when you generate the BOQ
  1. 318rows received

    243 material, 75 labour, measured off 48 drawings.

  2. groupedby spec key

    Rows sharing one are a single purchasable item. Material and labour never merge.

  3. PO or WOtagged

    Material is bought on a purchase order, labour on a work order.

  4. 4left blank

    A quantity is a measurement. Gaps go to a person, never to a guess.

Grouping and adding, nothing else. You can change any line afterwards, until you freeze it.