Vendor Governance Bee

NSOffice.AI
The drawings these quantities came off

38 drawings

Of the 48 sheets in IFC rev 2, these are the ones something was measured on. Pick one to see what came off it.

C-020 Basement waterproofing sectionsRev 2 · issued 22 Dec 2025 · scale 1:25
C-020Structure1:25The drawing PDFs are not part of this collateral, so this is a placeholder.
What was measured on this drawing
W-01Basement, podium and lift pit membrane waterproofing31,240 m2
See these in the BOQ