Vendor Governance Bee

NSOffice.AI
The drawings these quantities came off

38 drawings

Of the 48 sheets in IFC rev 2, these are the ones something was measured on. Pick one to see what came off it.

A-501 Lift core plan and sectionRev 2 · issued 22 Dec 2025 · scale 1:50
A-501Architecture1:50The drawing PDFs are not part of this collateral, so this is a placeholder.
What was measured on this drawing
E-01Supply of passenger lifts, 13 persons, 2.5 m/s, 26 stops4 nos
E-02Supply of service and stretcher lift, 26 stops1 nos
E-04Lift pit waterproofing and machine room civil works1 lot
W-01Basement, podium and lift pit membrane waterproofing31,240 m2
See these in the BOQ