Vendor Governance Bee
NSOffice.AIThe drawings these quantities came off
38 drawings
Of the 48 sheets in IFC rev 2, these are the ones something was measured on. Pick one to see what came off it.
Architecture · 13A-120 Podium deck plan1 itemA-130 Terrace and overhead tank plan1 itemA-301 Typical floor plan3 itemsA-310 Internal finishes schedule7 itemsA-311 External finishes and elevations4 itemsA-320 Toilet and wet area details3 itemsA-330 Flooring layout, typical floor6 itemsA-331 Lobby and common area finishes3 itemsA-401 Facade glazing elevations and details4 itemsA-406 Podium cladding and railing details3 itemsA-501 Lift core plan and section4 itemsA-610 Door and window schedule5 itemsA-620 Window hardware and grill details2 items
Services · 16C-320 External lighting layout2 itemsC-321 External electrical and feeder pillar layout1 itemC-340 Landscape and irrigation layout2 itemsE-201 Power layout, typical floor1 itemE-220 Distribution board schedule1 itemE-230 LT panel and single line diagram2 itemsE-240 Lighting and accessory layout2 itemsE-250 Conduit and wiring layout3 itemsE-601 Lift electrical schematic2 itemsF-110 Sprinkler layout, typical1 itemF-120 Fire detection and alarm layout1 itemF-130 Hydrant and pump room piping3 itemsP-101 Plumbing riser diagram2 itemsP-120 Toilet plumbing and sanitaryware layout2 itemsP-130 Pump room layout2 itemsP-150 STP and rainwater harvesting layout2 items
Structure · 9C-010 Excavation, shoring and dewatering plan1 itemC-020 Basement waterproofing sections1 itemC-301 External roads and paving layout2 itemsC-310 Compound wall and gate details2 itemsC-330 Storm water and external drainage3 itemsS-001 General notes and structural specification1 itemS-110 Column and shear wall layout1 itemS-120 Slab and beam layout, typical1 itemS-201 Slab reinforcement, typical1 item
What was measured on this drawingSee these in the BOQ
E-03Installation, testing and commissioning of 5 lifts5 nos
E-05Supply of ARD units and 5-way lift intercom5 set