Vendor Governance Bee

NSOffice.AI
The drawings these quantities came off

38 drawings

Of the 48 sheets in IFC rev 2, these are the ones something was measured on. Pick one to see what came off it.

P-150 STP and rainwater harvesting layoutRev 2 · issued 22 Dec 2025 · scale 1:100
P-150Services1:100The drawing PDFs are not part of this collateral, so this is a placeholder.
What was measured on this drawing
P-03Supply of pumps, pressure vessels, STP and rainwater harvesting37 nos
P-04Plumbing installation, testing and commissioning, labour only1,09,938 m
See these in the BOQ