46 line items in 12 sections
Grouped the way site and procurement buy. Open a section to add, change or remove a line, then freeze it.
Electrical5 items · 3 PO, 2 WO1 line needs attentionnot priced yet
| Item | Type | Description | Unit | Qty | Take-off rows | Actions |
|---|---|---|---|---|---|---|
| L-01 | PO | Supply of FR LSZH cable, conduit and cable tray One take-off row was incomplete. ELE-048 has no unit in the extract. Read as metres and kept. The 8600 is a conduit run, confirmed with the services consultant against sheet E-201. Settled by null on 14 Jan 2026. | m | 4,92,840 | ELE-001, 002, 003, 004, 005, 006, 007, 008, 009, 010, 011, 012, 013, 014, 015, 016, 017, 018, 019, 020, 048 | |
| L-02 | PO | Supply of panels, DBs, accessories and light fittings | nos | 28,655 | ELE-021, 022, 023, 024, 025, 026, 027, 028, 029, 030, 031, 032, 033, 034, 035, 036, 037, 038, 039, 040, 041, 042, 043, 044, 045, 046, 047 | |
| L-04 | PO | Supply of APFC panel with capacitor bank and riser energy meters | nos | 8 | ELE-055 |
How this BOQ was made
- 318take-off rows
What the design team measured off the issued drawings.
- 46line items
Rows sharing a spec key became one item. Their quantities were added.
- 25 PO, 21 WOtagged
Material is bought on a purchase order, labour on a work order.
- 4needed attention
A quantity is a measurement, so each one waits for a person. Each line says what is missing.
Grouping and adding, nothing else. The same input gives the same BOQ every time.