46 line items in 12 sections
Grouped the way site and procurement buy. Open a section to add, change or remove a line, then freeze it.
Facade4 items · 2 PO, 2 WO1 line needs attentionnot priced yet
| Item | Type | Description | Unit | Qty | Take-off rows | Actions |
|---|---|---|---|---|---|---|
| G-01 | PO | Supply of glazing, DGU, spandrel and railing glass One take-off row was incomplete. FAC-005 has no drawing reference. Kept without a sheet. The mock up panel is approved against sheet A-401 and no separate drawing was issued for it. Settled by null on 14 Jan 2026. | m2 | 13,604 | FAC-001, 002, 003, 004, 005 | |
| G-02 | PO | Supply of aluminium, ACP, stone cladding and sealants | m2 | 70,852 | FAC-006, 007, 008, 009, 010, 011, 012, 013, 014, 015, 016, 017, 018, 019, 020, 021, 022, 023, 024 |
How this BOQ was made
- 318take-off rows
What the design team measured off the issued drawings.
- 46line items
Rows sharing a spec key became one item. Their quantities were added.
- 25 PO, 21 WOtagged
Material is bought on a purchase order, labour on a work order.
- 4needed attention
A quantity is a measurement, so each one waits for a person. Each line says what is missing.
Grouping and adding, nothing else. The same input gives the same BOQ every time.