46 line items in 12 sections
Grouped the way site and procurement buy. Open a section to add, change or remove a line, then freeze it.
Civil and structure4 items · 2 PO, 2 WOnot priced yet
| Item | Type | Description | Unit | Qty | Take-off rows | Actions |
|---|---|---|---|---|---|---|
| C-01 | PO | Supply of TMT bars Fe550D, 8 to 32 mm | MT | 4,120 | STR-001 | |
| C-02 | PO | Supply of ready-mix concrete, M30 and M40, pumped | m3 | 31,500 | STR-002, 003 | |
| C-03 | WO | RCC work with shuttering, labour only | sq ft | 2,64,000 | STR-004 | |
| C-04 | WO | Excavation, shoring and dewatering | m3 | 18,400 | STR-005 |
How this BOQ was made
- 318take-off rows
What the design team measured off the issued drawings.
- 46line items
Rows sharing a spec key became one item. Their quantities were added.
- 25 PO, 21 WOtagged
Material is bought on a purchase order, labour on a work order.
- 4needed attention
A quantity is a measurement, so each one waits for a person. Each line says what is missing.
Grouping and adding, nothing else. The same input gives the same BOQ every time.